Skip to content
BâtiConseil

Renovation scope-of-work document

A written scope of work, before you ask for quotes.

You are planning work but haven't called contractors yet. That is exactly the right moment: a well-written scope of work is what gets you comparable quotes and avoids bad surprises on site.

  • Civil engineer — OIQ
  • Delivered in 3–5 days
  • Ready to send to contractors
  • Clear document

This is for you if…

You are planning work and want to start on the right foot

How it works

Describe your project. We structure the rest.

  1. 01

    You describe your work

    Photos, measurements, goals, ideas: send what you have. If your project is still vague, no problem. That is exactly why we are here.

  2. 02

    We write the document

    Scope of work, inclusions and exclusions, quality criteria, execution conditions: structured so every contractor quotes on exactly the same basis.

  3. 03

    You receive a document ready to send

    In 3 to 5 business days: a structured, clear PDF, ready to send to your contractors to get truly comparable quotes.

What you get

A document that works for you

The scope of work is written to be sent directly to contractors, not to sit in a drawer.

Scope of work

Clear limits of the project, interfaces with the existing building, constraints identified: everything the contractor needs to know before quoting.

Inclusions & exclusions

What is included, what is not, and what remains to be confirmed. Fewer ambiguities mean fewer extras during the work.

Quality criteria

Materials, finishes, methods and equivalents defined in writing. Every contractor knows exactly what level of quality is expected.

FAQ

Frequently asked questions

I don't have plans yet — is that a problem?

No. The scope of work is based on what you have: photos, approximate measurements, a description of your project. We adapt to what you can provide and identify what remains to be confirmed.

What is the difference between a scope of work and a contractor's quote?

The contractor's quote is the price they offer you. The scope of work is what YOU define before asking for a price: the scope, the materials, the criteria. It is your document, not theirs.

Does the scope of work guarantee there will be no extras?

It cannot eliminate every unknown; some only appear once walls are opened. But it greatly reduces extras caused by unclear information, omissions and vague assumptions, which are the most common cause of surprises on site.

What types of work is it relevant for?

Bathroom, kitchen or basement renovation, roofing, windows, exterior cladding, structural work: any project for which you will ask contractors for quotes benefits from a clear scope of work.

Ready to start on the right foot?

Set the rules of the game before you call contractors.

A scope of work written by an independent engineer, in 3 to 5 business days. To compare quotes on the same basis.

From $399 · PDF in 3–5 days